New Construction & Deals
Building in Two Step Farm: The Timeline from Contract to Closing

What to expect when you build a new home in Two Step Farm, Montgomery TX — contract, design selections, construction milestones, walkthroughs, and closing.
Most people touring Two Step Farm for the first time ask two things: what does it cost, and how long does it take? Price depends on the builder, the plan, and the homesite. Timeline is more predictable — not because every build runs the same, but because the sequence is always the same. Knowing the sequence is what keeps a build from feeling like a black box.
Before contract: homesite and plan
You're choosing three things at once — the builder, the floor plan, and the homesite — and they constrain each other. A plan may only fit certain lot widths; a homesite you love may be released in a later phase. This is also the stage to understand what's included versus optional, because that's where budgets drift later.
Two things worth doing here: get pre-approved before you write, and ask what is planned around the homesite (see the community master plan). With nine builders active in Two Step Farm, "which builder is best" is the wrong question. "Which builder fits this plan, this budget, and this timeline" is the right one — that's what our builder overview is for.
Contract and earnest money
You'll sign the builder's own contract — not the standard TREC resale form — plus addenda covering the plan, options, and homesite. Read the sections on completion timing, allowances, change orders, price adjustments, and what happens to your earnest money in each scenario. Builder contracts are negotiable in fewer places than resale contracts, but they are not unreadable, and the parts that matter most are usually short. Bring your own representation to this step.
Design selections
Depending on the builder and the stage of the home, this can be several appointments or one session on a nearly-set home. It's also the fastest place to add money. A workable rule: decide before your appointment which two or three upgrades you actually care about living with, and treat everything else as a maybe. Structural changes have to be decided earliest — you can't add them once framing starts.
If a builder is offering incentives, this is when you'll see how they apply — some attach to financing, some to options, some to specific inventory homes. We track current offers on the incentives page.
Permitting and site work
Nothing looks like it's happening. Plans are reviewed, the lot is cleared and graded, utilities and forms go in, and the slab is poured. Expect this stretch to feel slow and expect weather to move it. Your first real milestone photo is the slab.
Framing through mechanical
Framing goes up quickly and gives you the first honest sense of the space — this is when clients realize a room reads bigger or smaller than the plan suggested. Then roofing, windows, and the rough-in of plumbing, electrical, and HVAC, followed by inspections and insulation. Once drywall goes on, everything behind the walls is closed. If you want to see how your home is built, this is the window.
Finish-out
Drywall, cabinets, tile, trim, paint, flooring, fixtures, counters, then the exterior — driveway, landscaping, fencing. Progress becomes visible again week to week. Two notes: finish-out is where supply timing on a single item can shift a completion date, and it's where you should start watching quality closely rather than only pace.
Walkthroughs and closing
You'll typically have a pre-drywall walk and a final orientation walk where you build a punch list and learn how the house works — shutoffs, panel, HVAC filters, warranty registration. Do the final walk unhurried, in daylight, and write down everything, including cosmetic items. Then financing is finalized, title schedules, and you close and get keys. The warranty period starts at closing, and the first year has its own rhythm — we covered that separately on the blog.
If you already own a home
The most common timing problem isn't the build — it's the overlap. Selling too early means renting; too late means carrying two payments or losing the home you wanted. There are several ways to sequence it, including buy-before-you-sell structures; the tradeoffs are on our buy before you sell page.
The short version
A to-be-built home is a sequence of decision windows that close in order: homesite, then structural, then finishes, then punch list. Miss a window and the fix gets expensive. Know the windows and the build gets calm.
We live in Two Step Farm and work it every day. If you want a straight read on which builders fit your plan and timeline — or a second set of eyes on a contract you've already been handed — reach out or call 281-595-9774.